crowe-t Posted July 27, 2016 Share Posted July 27, 2016 (edited) Manfred, It looks good to me. Once it's painted and the pipes are installed on the MLP it will look just fine. The screws are so small at the 1:160 scale that the .4 mm tubes you are using look correct. Mike. Edited July 27, 2016 by crowe-t Quote Link to post Share on other sites
spaceman Posted July 27, 2016 Author Share Posted July 27, 2016 Thanks Mike, yep, if it is painted, one can see that something is there like a screwing, but not what it is really, and that's enough. Quote Link to post Share on other sites
spaceman Posted July 28, 2016 Author Share Posted July 28, 2016 Hello everybody, finally the last two 18'' outlets without rejuvenation also have received their support plates. Then I have shortly pre-drilled the upper bows with Ø 0.5 mm, inserted rods (Ø 0.45 mm) for the nipples and glued them with MEK, which then were cut and carefully sanded down to 0.4 mm height. And then there were also still the six 18'' outlets with rejuvenation which I had almost forgotten. Therefore the same procedure all over again on these bows. Now missing only the nipples of the two front 12'' outlets, which previously still have to get their outlet openings with baffles. Quote Link to post Share on other sites
spaceman Posted July 30, 2016 Author Share Posted July 30, 2016 Hi there, Today I want already times to have a look ahead how it goes on shortly. There are still these two 9'' outlets (Ø 1.4 mm), which branch off before the 12'' outlet from the 24'' ring line, then run through below the SRB Blast Shields, Source: NASA and feed the line with the outlet nozzles on the rear wall of the SSME exhaust chamber, Source: NASA which I have completed for some time, as well as the tricky Firex line. And at the other end of the 24'' ring lines it goes on behind the TSM's with the 16'' rejuvenations (Ø 2.5 mm) which are tapering one more time to 11'' (Ø 1,8 mm) after the first bending, Source: NASA and end in the SSME chamber in these pipes stocked with eight outlet nozzles. Source: NASA In order to continue with these details, I had to make measurements and scalings again. And as it looks like, it will be probably again pretty tricky, I guess. Quote Link to post Share on other sites
spaceman Posted August 1, 2016 Author Share Posted August 1, 2016 Hello everybody, here still a small addendum to two outlets that are missing yet, these are namely those four 6'' outlets (Ø 1 mm) here, which although were to be seen already, but have not yet been regarded. Source: NASA These transitions branch off from the ring lines, run under the SRB Blast Shields, and reappear between the front SRB Supports, whose ends with the outlet openings also already exist. And the two 24'' ring lines are fed in through these two 36'' inlet pipes in the corners of the SRB-wells that were already shown also. Here is the upper confluence into the ring line, Source: NASA and here the lower end with the coupling elements, Source: Troy McClellan which must not be missing. And in order that during the further adaptation and assembly of various outlets everything goes well and the ring lines cannot shift constantly themselves, I have precautionally carved even more mounting aids. These mounting aids are then certainly also indispensable during subsequent assembly of so many pipe supports. Quote Link to post Share on other sites
K2Pete Posted August 1, 2016 Share Posted August 1, 2016 Your powers of observation and your ability to build what you are seeing is ... AMAZING! I just went back to your 1st page and realized that the MLP may be the easiest subassembly to build ... I had forgotten that you are going to build the Crawler too. Something else that interests me is your ability to just ... continue to build ... you don't seem to have lost any interest at all! You have maintained a steady pace and continue to solve problems as they arise and your results are superb! Plus, your photos are excellent too! Thanx Manfred! Pete Quote Link to post Share on other sites
crowe-t Posted August 1, 2016 Share Posted August 1, 2016 Your powers of observation and your ability to build what you are seeing is ... AMAZING! I just went back to your 1st page and realized that the MLP may be the easiest subassembly to build ... I had forgotten that you are going to build the Crawler too. Something else that interests me is your ability to just ... continue to build ... you don't seem to have lost any interest at all! You have maintained a steady pace and continue to solve problems as they arise and your results are superb! Plus, your photos are excellent too! Thanx Manfred! Pete Well said Pete! Manfred is just pushing on with this one and even with some of the problems he encountered he just continued on and his efforts are really paying off. Mike. Quote Link to post Share on other sites
spaceman Posted August 1, 2016 Author Share Posted August 1, 2016 Your powers of observation and your ability to build what you are seeing is ... AMAZING! I just went back to your 1st page and realized that the MLP may be the easiest subassembly to build ... I had forgotten that you are going to build the Crawler too. Something else that interests me is your ability to just ... continue to build ... you don't seem to have lost any interest at all! You have maintained a steady pace and continue to solve problems as they arise and your results are superb! Plus, your photos are excellent too! Thanx Manfred! Pete Thanks Pete for your nice words, your praise pleased me always especially, because it is honest and comes from the heart. Maybe it's unbelievable, but it's true and you see that right, my interest is unbroken and the fun of scratch building of all those tricky details will never end. True to my motto: You can make it if you try, and therefore make it correctly, or leave it. Quote Link to post Share on other sites
spaceman Posted August 1, 2016 Author Share Posted August 1, 2016 Well said Pete! Manfred is just pushing on with this one and even with some of the problems he encountered he just continued on and his efforts are really paying off. Mike. Thanks Mike for your compliments too. The effort is really considerable and makes it very time consuming, but it is worth definitely. Quote Link to post Share on other sites
spaceman Posted August 7, 2016 Author Share Posted August 7, 2016 Hello everyone, initially I still want to show the two 12'' outlets, which now have got their outlet openings and baffles as well as the nipples. And after that it initially went on with the 9'' transitions (Ø 1,4 mm) of the 24'' ring lines (Ø 4 mm), standing on a tall support pillar. Source: NASA What on the pictures firstly looks really practical and invites for scratching, then pretty shrinks on the 1:1 Sketch again. After determining of the dimensions of the components began the search for suitable profiles. For the pillar Evergreen rods are suitable with Ø 1 mm (bottom) and 1,4 mm for the upper sleeve, on which a flat 2 mm U-profile sits and on this a small "Sickle". Of the width for the U-profile a corresponding Evergreen channel would be suitable, but is unfortunately too thick for this filigree support and the sides with 1 mm too high. That's why I prefered to bite the bullet and have scratched the profile of 0.15 mm Styrene. For the sides I have sanded down an Evergreen strip 0.25 mm x 0.5 mm to 0.15 mm and then glued with MEK. And the difference is clearly visible, as one can see here. Then bending was indicated again, this time with the 1.4 mm rod, what agrees very well with the sketch. Quote Link to post Share on other sites
spaceman Posted August 7, 2016 Author Share Posted August 7, 2016 After that I've drilled a hole with 1.4 mm in the front inner corner of the SRB Blast Shields, and made a test that was okay instantly. And that also fits well with the underlying 12'' outlet. Now is still missing the support pillar, which I'll make tomorrow. Quote Link to post Share on other sites
spaceman Posted August 9, 2016 Author Share Posted August 9, 2016 Hello again, but initially the 9'' outlet still received a few small details. At the feedpoint of the 24'' ring line is a small thickening to see, for what I have punched a small Styrene disc (0.5 mm) with Ø 1.6mm, which has already been glued, as can be seen in the following figure. Due to the small diameter of the outlet of 1.4 mm also the diameter of the nipple is correspondingly smaller with only 0.3 mm, for what only a tiny hole were to drill, into which my thinnest rod with Ø 0,3 mm was glued. Next to it is a lead wire with a diameter of 0.3 mm, which I will use for the clamping ring on the other end. The lead wire I have glued with CA. And so the final outlet looks, from which I still need a second copy. And now to the slender support pillar, which stands under this outlet and consists of six parts, Source: NASA which I have already prepared and are all quite tiny, which must be glued together now. Quote Link to post Share on other sites
spaceman Posted August 9, 2016 Author Share Posted August 9, 2016 And I can tell you, the mounting should become a tricky matter due to the minimal contact surfaces. Since I glued these things with normal Revell glue for possible corrections, one can not continue, but must wait until hardening. And the height of the support I should also check from time to time, since it should not exceed 9 mm in order to fit even under the outlet. And for that reason alone every now and then a break is necessary, like now, why the base plate and the top plate have to wait. Quote Link to post Share on other sites
spaceman Posted August 10, 2016 Author Share Posted August 10, 2016 Hello everybody, and here is the next update. Since I still wanted to check the total height of the support pillar, I have not initially sanded the tiny rounding in the upper pipe holder, especially since it is anyway only 1 mm x 1 mm "big". The problem with this prototype is, that the height of the components should be exact as possible on the tenth of a millimeter, if in the end should be reached the calculated required total height of 9 mm, so that the support fits under the transition. Subsequently, the support was positioned on the base plate and glued, and then vertically aligned on all sides vertically. And so the filigree structure looks, which is very fragile and wherefore the further handling is to enjoy with caution. With the optical look of the support I am already very satisfied, although actually still missing these two screwings, Source: NASA which I wanted to try at least times. In my estimation, one could scratch it by thin rods, which would, however, which would be again in the boundary region of the nipples with Ø 0,3 mm. Quote Link to post Share on other sites
spaceman Posted August 10, 2016 Author Share Posted August 10, 2016 That would be even doable, although this strip (0.37 mm x 1.5 mm) is slightly wider than the only 1 mm wide plate under the pipe holder, and through the shadows it could be seen even better in the painted state, questionable would be, however, from what distance ... But more important is the question whether and how the support would fit at all. And to my surprise, it fits already together relatively well, although the left side of the pipe hangs a bit in the air, as can be seen more clearly in this close-up. But this should be still compensable if I sand even a tinier rounding in the tiny pipe holder (1 mm x 1 mm) and it plays along. Although this support was quite tricky, this looks but overall very well. Quote Link to post Share on other sites
spaceman Posted August 10, 2016 Author Share Posted August 10, 2016 Hi there, making of the tiny rounding was not a problem, especially since only a hint of 0.15 mm was necessary. And here is the result, and because the transition now sits a little bit lower, so far everything is okay. Therefore, the rounding of the second pipe holder will be made before assembly. Quote Link to post Share on other sites
TomcatFanatic123 Posted August 11, 2016 Share Posted August 11, 2016 You really are amazing. This gets better every time I look at it. I seriously have no words. Quote Link to post Share on other sites
spaceman Posted August 11, 2016 Author Share Posted August 11, 2016 Thanks TF for your kind words. These small details are quite tricky, cost a lot of time and therefore I can progress only slowly, but the effort is worthwhile. Quote Link to post Share on other sites
spaceman Posted August 15, 2016 Author Share Posted August 15, 2016 Hello together, despite the interesting divertissement by the Olympics the SSWS pipes were continued in the meantime. Today, the second 9'' transition was scratched, which had to be bent again initially. Although the processes are now already familiar, the difficulty is to make the transitions as identical as possible. These are the individual parts up to the two rods for support pillar. After the filigree U-shaped substructure has been scratched, the difficile assembly of the parts followed, which was quite stressful again. And so the couple was complete, and could be tested on the MLP. Quote Link to post Share on other sites
spaceman Posted August 15, 2016 Author Share Posted August 15, 2016 Although the provisional fastening of the outlets with Pattex is also such a tiresome game of patience and does not long hold out, for the imposing overall impression the effort is worth to me, which is why I have brought out the Rainbirds again. So much for today. Quote Link to post Share on other sites
Mknorr Posted August 15, 2016 Share Posted August 15, 2016 Really amazing work! 👍 This will be a museum quality item when it's all done. 🍻 Quote Link to post Share on other sites
crowe-t Posted August 16, 2016 Share Posted August 16, 2016 Manfred, It's like you shrunk down an actual MLP, this is so good! Mike. Quote Link to post Share on other sites
spaceman Posted August 16, 2016 Author Share Posted August 16, 2016 (edited) Thanks Manfred and Mike for your nice words of praise, if that actually is so, it must be succeeded probably pretty well, what gives me the right kick, to bite me through this crazy SSWS pipes till the end. Thanks again my friends for all the support! Edited August 16, 2016 by spaceman Quote Link to post Share on other sites
spaceman Posted August 16, 2016 Author Share Posted August 16, 2016 Hello everybody, after the outlets in the SRB chambers except for the two 36'' feed pipes and the nine missing pipe supports are done, it is now time for the last two outlets behind and under the TSM's. This initially affects the section behind the rejuvenation of the 24'' ring line to 16'' (Ø 2.5 mm) just before the corner of the TSM beside the SSME chamber to 12'' (Ø 2.0 mm), such as re-measurements have shown. Source: NASA On this pipe sitting eight small bent nozzles, which should have a diameter of about 0.5 mm. Source: NASA In order to adapt this outlet I initially have bent for simplicity a continuous piece of rod Ø 2.0 mm, ranging from the ring line to the end of the nozzle tube under the TSM, which is sitting on two support angles. This way possibly necessary corrections of position and mounting of the nozzles should be made easier, and only when everything matches this nozzle tube is cut at the last rejuvenation and connected to an intermediate piece with Ø 2,5 mm, which begins at the ring line (Ø 4,0 mm). Here this continuous pipe is bent, which begins at the ring line. And this is the first test that looks already times quite good, although the tube seems to be a little too close to the TSM corner, what I'll be watching in more detail once more. Quote Link to post Share on other sites
spaceman Posted August 19, 2016 Author Share Posted August 19, 2016 Hello everybody, meanwhile shape and seat of the nozzle pipe have been slightly modified, and for facilitating the tests I have tinkered a little TSM Balsa dummy to avoid unnecessary stress for the final TSM. And hence to the tricky nozzles that had already made some headache a year ago dealing with the nozzle pipe on the rear wall of the SSME chamber. Because my former manufacturing method of the individual nozzles in retrospect appeared as being too complicated, I have fiddled about another solution that should be less stressful. While on the former almost twice as long tube (approx. 32 mm) were arranged six nozzles, on this tube (about 16 mm) under the TSM this time even eight nozzles with Ø 0,5 mm are to be accommodated, resulting in distances of about 1.4 mm. For the marking and drilling I have benefited of a PE template (cmkkits.com) for 0.8 mm rivets, which was very helpful. First I have pre-drilled with Ø 0,3 mm and then after that with Ø 0,5 mm. The idea was to insert somewhat longer rods (about 7 mm, Ø 0.5 mm) into the holes, to glue them with EMK and thereafter to bend all together at one time under moderate hot air in the final form, and then to cut. Therefore, the pipe had to be clamped again in a balsa corset, what has proven itself in similar form already several times. Quote Link to post Share on other sites