Hello everybody,

 

in the meantime, I went into more detail to find out where the interface between the LH2 Cable Tray and the Aft ET/Orbiter Attachments is, or how the cables out of the the LO2 Cable Tray get there, especially since this is a pretty tricky affair and there are hardly any direct photos of this interface. smiley_worship.gif

 

One also should know how the cables run out of the cable tray onto the LH2 Tank from point A via B and C respectively D to the LO2/LH2 Umbilicals and wherefore this gray box (?) is used, which could possibly be a kind of distribution box? up047089.gif

 

up067915.jpg

Source: NASA

 

Maybe there are useful hints from the forum, if so, then always ago with it. up040577.gif

Link to post
Share on other sites

Hello folks,

 

to this question I also consulted my friend DaveS (forum.nasaspaceflight.com), who also had some interesting photos in stock, like this one.

 

up067914.jpeg
Source: NASA

 

on which unfortunately one can not see this interface of the LH2 Cable Tray that interests me, as it is obscured by the Vertical Strut as in most photos. rolleyes.gif But at least one can see more of the arrangement of this gray 'distribution box', which apparently has such a function. huh.gif

 

Afterwards, I've continued to search for the interface myself, and as one could already see in this photo, 

 

up067915.jpg
Source: NASA

 

the LH2 Cable Tray seems to run diagonally upwards at the point A, possibly to this 'distribution box', up047089.gif as it also appears in this photo of the ET-8 (STS-6).

 

up067916.jpg
Source: forum.nasaspaceflight.com (woods170)

 

The matter got a bit clearer to me when I saw this photo of the ET-119 (STS-121) zoomed in,

 

up067918.jpg
Source: NASA

 

on which one can see at the point A the continuation of the gray LH2 Cable Tray, but which not directly leads to the 'distribution box' but apparently to the Vertical strut. hmmm.gif
And then suddenly the penny dropped, idea1_2.gif when I've again checked this photo again and asked DaveS for it.

 

up067919.jpg

 

And on this image detail of ET-122 (STS-134) one can see this interface almost even better.  up046118.gif

 

up067920.jpg
Source: forum.nasaspaceflight.com (Jester)

 

And finally, DaveS confirmed my guess and sent me this detail photo of the ET-125 (STS-122), whereat the orientation is a bit difficult to see at first glance.  cant-believe-my-eyes-smiley-emoticon.gif

 

up067921.jpg

 

Who wants, can first try to find one's way before it goes on with the further course of the LH2 Cables, as they still did not arrive their goal at the LH2 Umbilical ... up040577.gif

Edited by spaceman
Link to post
Share on other sites

Hello everybody,

 

okay, I admit that this photo by DaveS takes some getting used to, and I also took some time to find my way, although I've already seen many similar photos, but not yet with opened cable tray.  top.gif

 

up067921.jpg
Source: forum.nasaspaceflight.com (DaveS)

 

What strikes all these photos is this ominous 'distribution box', huh.gif who initially looked orange-brown, as here at the mission STS-6

 

zCcipj.jpg
Source: forum.nasaspaceflight.com (woods170)

 

or here at STS-47

 

NVhPRP.jpg
Source: georgesrockets.com (George Gassaway)

 

Only with the later missions he looked then gray, as in the following picture. As one can see, from this 'distribution box' the yellow marked LH2 Cable Tray seems to branch off, which then on the front of the Crossbeam runs to the other side to the LH2 Umbilical. hmmm.gif

 

SNMvCr.jpg
Source: forum.nasaspaceflight.com (DDG40)

 

The confirmation for my guess came then with this great photo by Scott Phillips, speak_cool.gif whom I've also consulted, here with the front TPS covering removed.

 

oP79en.jpg
Source: Scott Phillips

 

And with that the hitherto searched interface of the LH2 Cable Tray gradually becomes clearer, which I have circled here yellow, which discharges into the TPS cladding of the Vertical Strut. top.gif

 

ofOhTr.jpg
Source: forum.nasaspaceflight.com (DaveS)

 

And, as I've learned by now, not only the LH2 cables run inside the LH2 cable tray, but also the LO2 cables, which was not clear to me yet. huh.gif But as I learned from DaveS too, the cable trays that time were named after the ET tanks (LH2/LO2) and say nothing about the cables running in it, but what one has to know. smiley215.gif

 

And by this picture-in-picture montage will hopefully become clear, where this place is located, whereby this image is rotated 90° and the TPS cladding on the front of the Vertical Strut is open (blue arrows). cant-believe-my-eyes-smiley-emoticon.gif

 

mwgaIB.jpg

 

In the next photo one can see the opened LH2 Cable Tray in front of the crossbeam with the cables running into it, which lead to the LH2 Umbilical,

 

Anu6w3.jpg
Source: Scott Phillips

 

as well as here the cable harnesses laid in the opened knee of the LO2 Cable Tray. up045518.gif

 

H7eywR.jpg
Source: Scott Phillips

 

And so I now know about how the cable trays and other lines run, and thus can try to scratch this ET/Orbiter Attachments accordingly. up040577.gif

Link to post
Share on other sites

Hello everybody,

 

but this is just one side of the ET/Orbiter Interface. cool.gif

 

up067924.jpg

 

But the other side on the Shuttle has to fit too. huh.gif And therewith it looks pretty poor on the Airfix Kit, smiley_worship.gif 

 

NHuqno.jpg

 

because the two Orbiter doors are not present, let alone their deepenings in the opened state, just like one needs it for the Stack (ET/Orbiter). rolleyes.gif

 

x1vuWA.jpg
Source: NASA

 

The least would therefore be a solution in which one could glue a Decal or a paper printout of the two doors in the opened state onto the appropriate place, which would look a bit better, namely something like here.  top.gif

 

xJe3we.jpg

 

BTW, if I remember rightly, Hotdog had provided similar decals in his set, right, Brian? hmmm.gif

 

It would be even still better, of course, if the two deepenings were really brought in, however, and then glue the Umbilical decals into, or simply the printout, and the two doors in between, what I could imagine. speak_cool.gif

 

This is what my friend Mike (egt95) did in this forum here on his STS-1 stack.  speak_cool.gif

 

ColumbiaSTS-132640x480_zpsadcbd366.jpg
Source: arcforums.com (egt95)

 

But since this place at the finished stack on the MLP can not be seen anyway, glued decals/printouts without the openings, but with glued doors would actually suffice. smiley215.gif

 

In the meantime I started with the modification of the Airfix-Longerons, which protrude anyway and do not rest on flat. rolleyes.gif These are these stripes on both sides at the end of the LH2 Tank, on which the oblique Thrust Struts and the Vertical Struts are mounted, because these parts do not look like in reality, as one could see already on this well-known photo of the ET-8.

 

up067836.jpg
Source: forum.nasaspaceflight.com (Jester)

 

For me, it seems, that the SOFI patterns has been leveled in this area, with only the front wedge-shaped part is supporting the oblique strut. 

 

And this I have modified by sanding off the Kit-Longerons accordingly, whereby now the front slant ramp must be filled accordingly. 

 

zniJXg.jpg

 

And here I have tried to adapt the TPS cladding from the Newware Kit, for which I had to sand off approx. half of the lower block of the Airfix-Strut, however, whereby the lower part of the Resin-cladding seems too clunky to me, which is why it still has to slim down a bit.  hmmm.gif

 

Wd9cSW.jpg

 

But every beginning is difficult, just do not panic ... up040577.gif 

Edited by spaceman
Link to post
Share on other sites

 

14 hours ago, spaceman said:

 

BTW, if I remember rightly, Hotdog had provided similar decals in his set, right, Brian? hmmm.gif

 

 

 

Yes, that is correct

Link to post
Share on other sites

Your tenacity in wanting to discover, and understand, every detail of this hardware is remarkable! You've got us all watching with our "jaws on the floor" ( I hope this translates well! ) ... not just here on ARC but on Britmodeller too. We  wish we could help you, but, you're breaking new ground in researching this!

 

I was glad to read that Scott Phillips sent you some images too ... who better to know the details of the ET?

 

I'm enjoying being a spectator!  :thumbsup:

 

Thanx Manfred!

Pete

Link to post
Share on other sites

Thanks Pete for your appreciatory words. :worship:

 

And if your jaw is dropping, then I can imagine your astonished face, and have to smirk secretly. top.gif


But these detailed analyzes belong for me to my understanding of this impressive technique, even if they seem to be too much for some. up040577.gif

 

And Scott Phillips has helped already me with many great images, he was after all close for 30 years. smiley250.gif

Link to post
Share on other sites
54 minutes ago, spaceman said:

And Scott Phillips has helped already me with many great images, he was after all close for 30 years.

Now there's a man who can honestly and literally declare that he knows the external tank inside and out!

And he writes a pretty decent book too.

Link to post
Share on other sites

As one can see here. top.gif

 

Yh9Mq0.jpg
Source: NASA

 

Scott "Shutttleman" Phillips in the Man Tube.

 

jouSs5.jpg
Source: Scott Phillips

 

And he has built many (450) great wooden models of Shuttle Stacks and had them signed by many astronauts, as here in the picture with the STS-1 crew, John Young † (Middle) and Robert Crippen. smiley250.gif

 

QOwPMs.jpg
Source: Scott Phillips

 

And his book Remove Before Flight is a Must Have for any shuttle lover, here with his sponsor Buddy. up045518.gif

 

up068007.jpg
Source: Scott Phillips

Link to post
Share on other sites

Hello everybody,

 

who wants to know more about the ET cabling as well as about the Cable trays and their Thermal protection system (TPS), here one still can find some interesting information. top.gif

 

XhwOIq.jpg
Source: System Definition Handbook SLWT (Lockheed Martin)

 

CrJGBW.jpg
Source: System Definition Handbook SLWT (Lockheed Martin)

 

As one can see in the first picture, it was distinguished between Internal and External LO2/LH2 Cabling. up045518.gif

 

But there is another important interface, namely the ET/SRB interface between the ET and the SRBs, about whose cables, sensors, etc. the separation of the burned SRBs has been activated.  

 

And unfortunately, this interface with the associated Cable Tray is also missing in the Airfix Kit and therefore also needs to be scratched.  

 

KVTMJ3.jpg

 

In this photo of the ET-8 one can see the transition of the Cable Tray from the vertical strut to the SRB Support, where the wiring passes through the Upper Attach Strut

 

0A1zI8.jpg
Source: forum.nasaspaceflight.com (woods170)

 

This also makes it clear what these strange extensions at the end of the vertical strut mean, which I have noticed time and again. huh.gif

 

sy4Ytg.jpg
Source: nasaspaceflight.com (woods170)

 

These are the cable ends running from the root point of the Upper Attach Strut to the Aft ET/SRB Attach Ring (see previous picture). 

 

And these are those cables that can be seen in this photo, which can be seen at the bottom of the SRB Cable Tray in the previous image, 

 

up067921.jpg
Source: NASA

 

and then run into the booster via the Upper Attach Strut.  up040577.gif

Link to post
Share on other sites

Hello everybody,

 

although there is now clarity about the SRB struts, I still have problems with the shape of the Vertical strut of the ET/Orbiter Attachment, because the lower part of the Newware TPS-Facing looked a bit too clunky, rolleyes.gif  why I've dealt with this assembly once again and have analyzed further photos. cool.gif

 

For this I have repeatedly compared these two photos of the ET-8 (STS-6) and first tried to reconstruct the contours of the struts and to bring into agreement, which is not so easy, because the images were taken from different positions and thus certain details are partially obscured. smiley_worship.gif 

 

HH3iVz.jpg
Source: forum.nasaspaceflight.com (Jester)

 

up067916.jpg
Source: forum.nasaspaceflight.com (woods170)

 

In particular, the two yellow and blue marked areas have puzzled me, smiley215.gif whereby the yellow marked wedge-shaped foot looks somehow different than the one on the Newware strut. Whose chunky form is more akin to the struts used in later missions, as seen here in STS-134 (ET-122). huh.gif

 

96ghBa.jpg
Source: NASA

 

Irritating is also the lower contour directly at the yellow arrowhead in the first image, which does not belong to the strut, but to the flattened SOFI pattern area of the Longeron, which is illustrated in this image by the yellow contour.

 

7nn9YG.jpg

 

Furthermore, it can be seen from the blue dimension arrows that the lower foot part is not wedge-shaped as the Newware part. 

 

And with this the vertical strut gets this blue drawn contour with a flowing transition to the SRB Cable Tray, which extends to the Upper Strut.  speak_cool.gif  

 

O3sjTp.jpg

 

This still leaves this question mark at the blue marked recess from the first picture open, which one unfortunately can not see in this last view. smiley215.gif

 

This wedge-shaped part seems in my opinion to be a part of the TPS facing which has been retrofitted, this recess probably having been finished later. In contrast to the SOFI Spray applications, these TPS parts were molded separately and mounted individually, just like the Intertank Closeouts. top.gif

 

And these are now the estimated dimensions for the scratch construction of the Vertical Strut, which show that especially the chunky foot part of the Newware facing does not fit the mould of the ET-8 and therefore has to be modified. 

 

dGVa9V.jpg

 

As reference dimension (yellow) was used the diameter of the rear part of the Thrust Strut, which is 16,6" at the original, which roughly corresponds to 3 mm of the Airfix part. up040577.gif

Link to post
Share on other sites
  • 2 weeks later...

Hello everybody,

 

what you will have noticed already, but unfortunately I have to slow down a bit, huh.gif because I have to take care more of my sick wife and our poodle Gino, who suffered two cruciate ligament tears in no time, eek.gif whose second cruciate ligament tear will be operated next week. 

 

But nonetheless, it should go on on the Launch pad. cool.gif

 

I'm still dealing with the rear ET/Orbiter Attachments, especially since besides the adaptation of the Newware Kit parts, also some things of the Airfix Kit have to be corrected or modified. rolleyes.gif

 

What looks so nice and vivid on the Reference detail photos

 

up068262.jpg
Source: NASA

 

is in scale 1:144 everything much smaller and therefore does not appear so readily feasible by Scratch-building. hmmm.gif

 

That's why I've put on the orbiter, and as one can easily see, there's a hell of few place to accommodate the LH2/LO2 Umbilicals and associated Cable Trays as well as GH2/GO2 Press. Lines. smiley_worship.gif

 

lzCpjk.jpg

 

And thus immediately to a curiosity of the Airfix kit, after which the GH2 Press. Line directly discharges into the LO2 Feedline (see the small hole just before the bow), which in reality would be a disaster of course. yikes.gif

 

OS57oZ.jpg

 

While the GO2 Press. Line is correctly laid and leads to LO2 Umbilical, the GH2 Press. Line runs below the Crossbeam to the other side to the LH2 Umbilical

 

up068101.jpg
Source: forum.nasaspaceflight.com (DDG40)

 

Here are two other views with the still too chunky TPS cladding of the Vertical Strut, which I have sanded so that it fits better into the picture. top.gif

 

MVFpim.jpg

 

DF8hSZ.jpg

 

And now more details come into play, which also want to be accommodated. These are the Diagonal Strut, as well as the LO2 Feedline/Umbilical Support Brackets, of which there is also one on the other side of the bow, but which is missing, rolleyes.gif

 

Vn0ejL.jpg

 

as one can see on this image.

 

v2FW0J.jpg

 

On this drawing one can indeed see the different versions of these LH2/LO2 Feedline/Umbilical Support Brackets very nicely,  

 

ecwpRl.jpg
Source: System Definition Handbook SLWT (Lockheed Martin)

 

however, it should be noted that all these parts are provided with a TPS cladding, which must be taken into consideration when scratching them. 

 

RZZnlW.jpg
Source: NASA

 

Yb50lh.jpg
Source: NASA

 

These two rings here are needless, because they do not exist on the real LO2 Feedline

 

QaKT0o.jpg

 

as one can see on this image.

 

CShLiw.jpg
Source: forum.nasaspaceflight.com (DDG40)

 

On it one can see the last two (out of five) LO2 Feedline Supports with the rings in front of them, which are missing at Airfix, excepting the ring in the next picture, but after that nothing like that comes up before the LO2 Umbilical. nono.gif

 

And finally to the chunky TPS cladding of the Vertical Strut

 

D4GWQj.jpg

 

which I've slimmed down even further (right), as one can see here.

 

5OfsVY.jpg

 

Now I have still to modify the left strut and its cladding accordingly, so that both sides look identically.  up040577.gif

Link to post
Share on other sites

Hi friends,

 

for a better idea of the true size of these parts I've put my Cent coin on the tank. top.gif

 

rdnIo0.jpg

 

And with some patience, I then have placed the coin on the Crossbeam, so you have a good comparison with the size of the Umbilical Plates. speak_cool.gif 

 

ptPdlO.jpg

Link to post
Share on other sites

Hello everybody,

 

now I will start scratch building of the LH2/LO2Umbilical plates, which look quite nice on the drawing, but in 1:144 these are only about 7 mm x 5 mm small plates, for which I have used Styrene (1 mm). Normally, 1,5 mm thickness would be more correct, but it should be remembered that the upper part of the Umbilical Plates protrudes into the orbiter openings, whose recess I want to avoid, because this place will not be seen later anyway on the shuttle Stack. cool.gif That's why I'll use 1 mm thick platelets on which then the orbiter rests flat.

 

up068094.jpg
Source: NASA

 

Since I have to take into account the distance to the Orbiter during testing the small Umbilical plates and tiny Cable trays, I've considered a small stencil (1 mm Styrene, which is much easier to handle. top.gif

 

On this stencil I have drawn the openings for the ET/Orbiter Attachment as well as for the two LH2/LO2 Feedlines from my scaled down drawing (1:144), as well as have cut out small paper stencils of both umbilicals.

 

z5ADim.jpg

 

h0kbag.jpg

 

After the plate fits quite well already (the red ones are the Cable trays),

 

RKGpmB.jpg

 

now follows the production of the two Umbilical plates, whose drawings I have glued with transparent tape on the 1 mm Styrene plate.

In order to be able to cut out and file the small plates, I first drilled the holes (Ø 3 mm) for the Feedlines and plugged in rod plugs, so that the templates can not slip during handling.

 

YObTTx.jpg

 

And then I cut out the little plates, whereat I've always compared it with the contours of the two umbilicals in this larger photo, because the parts are really tiny and also difficult to hold, smiley_worship.gif which was much facilitated by the inserted holding rod.

 

up068443.jpg
Source: NASA

 

And then I've carefully cut the contours of the stencils with the diagonal cutter and then gradually filed and ground the final shape all around, which was quite tedious. rolleyes.gif 

 

I started with the LO2Umbilical plate.

 

jnhwHN.jpg

 

OdPSwf.jpg

 

Then the holding stopper could finally be removed, 

 

d1bQbM.jpg

 

and this is now the finished part. speak_cool.gif

 

chnDRr.jpg

 

And in the same way followed the production of the LH2 Umbilical Plate.

 

1C0SYG.jpg

 

JLWWhm.jpg

 

Poc1wj.jpg

 

e3PfAw.jpg

 

And these are the two finished Umbilical plates
 
PHi3oM.jpg

 

which can now be test fitted on the Attachment. top.gif

 

6UFjIo.jpg

 

And as one can see, the two parts fit quite well with the attachment.  up045518.gif

 

TymHeY.jpg

 

ZIKZPE.jpg

 

And now a look ahead to the outer LO2 Support Bracket, which is missing on the Airfix Feedline which I have drawn red.

 

9vOMRU.jpg
Source: System Definition Handbook SLWT (Lockheed Martin)

 

Little by little, the bird builds its nest ... eichhoernchen_13.gif

Link to post
Share on other sites

Hello friends,

 

for an even better overview when fitting and assembling the Umbilical plates and Cable trays I have made the same template of Acrylic glass (PPMA), which now allows the total vista, cant-believe-my-eyes-smiley-emoticon.gif what is certainly an advantage when handling. speak_cool.gif

 

WomHXy.jpg

 

JclJ5x.jpg

 

Okay, I could have come to that immediately ... up040577.gif

Link to post
Share on other sites

Feeling your pain. I have to do the same work on the Tamiya Shuttle to marry it up to the 747. The decals I have come with all the graphics to do the pits as well as detail the doors. Looking forward to seeing more on how you prep the shuttle.

 

Tracy

Link to post
Share on other sites

Hi Tracy,

 

thanks for your compassion. :worship:

 

Since two years I'm following the interesting thread 747 Orbiter SCA Mounts Study by Crackerjazz, who is 3D modeling the Orbiter Assemblies for your Tamiya Shuttle 1:100 747, what is really an awesome work. top2.gif

Well, these filigree supports are really quite difficult and seem to be barely feasible in 3D printing, although Joe makes every effort. speak_cool.gif

 

Unfortunately, the ET/Orbiter Attachments are a bit more complicated regarding the Feedlines and Cable trays and a hard nut, but which I want to crack somehow. s-boese-wand02.gif

 

BTW, what Decals for the Orbiter Doors did you use? :hmmm:

 

 

Edited by spaceman
Link to post
Share on other sites

Your skills are wonderful to watch Manfred! One thing that impresses me the most is your ability to think through the 'problem' and work out a successful solution!

 

And I can't help but wonder what you would do with a 1/72 Shuttle Stack ...  :popcorn:

Link to post
Share on other sites

Thanks Pete for your nice compliment. :worship:

 

Regarding your question, what I would do with a 1/72 Shuttle Stack, is easy to answer:

 

I would build everything exactly as at 1/144, just twice as big!!! 00000016.gif

 

But joke aside,  1/72 is a fantastic scale, which enables scratch building of more details in better quality and accuracy - Boon or bane, that's the question ... up040577.gif

Link to post
Share on other sites

Hello everybody,

 

today,  I've been dealing with some filing and sanding work, first I had to sand the Vertical Strut of the ET/Orbiter Attachment on the left side in order to make it to fit for the TPS cladding of the Newware Kit and had therefore to modify the Resin part still a little bit. And then there was also the associated left Longeron, which had to be modified too. cool.gif 

 

Since the outer LO2 Feedline Support Bracket was missing anyway and the inner did not quite fit and was a bit too small, I've scratched both Support Brackets new. It should be noted, however, that both brackets look similar, but have not the same shape. huh.gif The inner bracket is a bit lower, 

 

4fpyw3.jpg

 

because the Diagonal Cross Strut runs over it and needs the appropriate space, as one can see on this image.

 

up068443.jpg
Source: NASA 

 

Afterwards I've sanded off the two unnecessary wide rings at the end of the Feedline. As one can see here, I have to smooth the line around the stub yet, which has to be removed anyway after the tests and its hole must be filled too, because in reality there were neither the two rings nor this holder.

 

EnIhnL.jpg

 

Last night I did not notice the nicks, but even all the more so in daylight. rolleyes.gif

 

These are the modified parts,

 

lRd9b5.jpg

 

whose seat on the ET I've tried next. And as one can see, they fit quite well so far.  top.gif

 

v0195R.jpg

 

Now I'm going to modify the too short LH2 Feedline Support Brackets, and then it goes on with the tricky Cable Trays with all due respect. smiley_worship.gif

 

But scaremongering does not apply!  up040577.gif

Link to post
Share on other sites

Hello friends,

 

after I've taken a look at the LH2 Feedline again and comparing it with my Reference photos,

 

9g2kI9.jpg
 
BlIDfa.jpg
Source: georgesrockets.com (George Gassaway)

 

up068094.jpg
Source: NASA

 

I have decided to remove the rings that are too narrow (0,5 mm) and to replace them with wider ones (1 mm), which are much better corresponding to the original. cool.gif

 

No sooner said than done! But when I measured the stub then after grinding off the rings, its diameter was instead of 3 mm only 2,7 mm, which I did not like. rolleyes.gif

 

RU2QV8.jpg

 

That's why I took a rod Ø 3 mm and bent it under hot air according to my proven Balsa-Bending-Technique. up045518.gif

 

3A4Pwf.jpg

 

But as it is sometimes, if one has not bent anything for a long time, this bending process did not go satisfactorily, because the lower balsa support behind the kink was too short, so that the kink of the rod was not bent exactly enough, but was slightly rounded as one will see. 

 

5zQUlM.jpg

 

I have taken this into account by a longer slope of the support and a more stable clamping of the rod, which has resulted in a more accurate bend, 

 

BfCrop.jpg

 

what one can see in the following picture by comparing the two bended rods. top.gif Above it are already to see  the 1 mm wide rings, which I have cut off from a tube with Ø 4 mm, which I have previously drilled out to 3 mm.

 

t5rfL3.jpg

 

Then I have filed the new stub to the required length and drilled a hole for the guide pin (Ø 1,2 mm),

 

fY728r.jpg

 

and glued it in place.

 

ATElyF.jpg

 

Here the two rings have been pushed onto the Feedline, which I will glue with MEK. speak_cool.gif

 

QKepwd.jpg

 

And so the new LH2 Feedline looks like after fitting, 

 

OomdG1.jpg

 

which I like much better now. top2.gif

 

XJa1Wt.jpg

 

And now I could also adjust the Feedline Brackets, which sit directly above the upper ring. But if one looks closely, one can still see a further ring directly below the Umbilical Plate.

 

ZHCRv9.jpg
Source: forum.nasaspaceflight.com (DaveS)

 

And this ring I have now also housed yet, as one can see in these two pictures, wherewith I now let it be good.  top.gif

 

LifFbT.jpg

 

owKvxc.jpg

 

The odd little cutouts in this ring I prefer to avoid because the ring might not be able to bear it. up040577.gif

Link to post
Share on other sites
  • 2 weeks later...

Hello everybody,

 

the Support Brackets for the LH2 Feedline also look different and are also mounted differently than the brackets for the LO2 Feedline on the right side. 

 

up068094.jpg
Source: NASA

 

As can be seen from this image, the two LH2 Brackets are not rigidly connected to the crossbeam like the LO2 Brackets, but rather are slightly laterally movable by Hinge elements, which is said to allow unrestricted relative distortion between the rear ET and the orbiter. huh.gif

 

up068443.jpg
Source: NASA

 

More precise information about the shape of the outer LH2 Bracket is given by this drawing, from which I have also determined the dimensions, whereby I've used the width of the Airfix Crossbeam (2,7 mm) as reference measure. top.gif 

 

RsxbkF.jpg
Source: System Definition Handbook SLWT, Vol. II (Lockheed Martin)

 

However, one has to keep in mind that this is the SLWT Handbook, i.e. this is how the Super Lightweight Tank (SLWT) looked like, which was used starting at the end of 1998, with some modifications in order to reduce weight in favor of larger payloads, compared to the Lightweight Tank (LWT) used for the first time at STS-6 (ET-8)

 

And as a further closer look at just this ET-8 shows, the inner bracket looks a bit different than my previous one,

up067836.jpg
Source: forum.nasaspaceflight.com (Jester)

 

which is why I've modified it a bit (right). top.gif

 

27gGKL.jpg

 

In order to finally fix the brackets and bond them with the Crossbeam, I put the Orbiter back on and fixed it with tape to see the exact distances and to adjust the brackets accordingly.

 

ztcYwL.jpg

 

And in this position, the inner bracket was  glued by using MEK with the Crossbeam and the LH2 Feedline.  up045518.gif

 

9HEDnQ.jpg

 

And now to the preparation of the outer bracket, which is drawn slightly longer, to which later the two holders for the LH2 Cable Tray are glued, as can be seen from the drawing. 

 

g1ad3H.jpg

 

The front cable tray mount is nice to see in this photo, but whereby the two Umbilical photos in the capcomespace dossier are reversed unfortunately. smiley_worship.gif

 

io79ud.jpg
Source: capcomespace.net

 

This was followed by the fitting of the outer bracket,

 

81Rhnb.jpg

 

and their cutback to the right length,

 

bWqiM0.jpg

 

and finally their gluing with the crossbeam and the feedline with MEK.

 

7PeDWH.jpg

 

Then I was able to remove the orbiter again and scrutinize from all sides the LH2 Feedline, glued on the crossbeam. spiegel-smilies-0002.gif

 

hU6jAQ.jpg

 

G2ZeUW.jpg

 

And now I could either glue the LO2 Feedline Brackets or lay the LH2 Cable Tray on the front of the Crossbeam.  up040577.gif

Edited by spaceman
Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...